Project Details

[Return to Previous Page]

Penn State Metalcasting Lab Facility Layout

Company: PSU Industrial Engineering Department

Major(s):
Primary: IE
Secondary: ME

Non-Disclosure Agreement: NO

Intellectual Property: NO

Description: Revise the layout of the Penn State Metalcasting space in the Leonhard Building FAME Lab to accommodate a 3D Sand Printing System (LightSpeed Concepts Inc.) and the associated storage and handling of sand and printing of molds and cores as well as their eventual disposal. The layout should include the layout and design of a simple shrink-wrap system for storing printed molds. Layouts can include re-location of some current equipment in the lab Tasks: -Develop 2 alternate equipment layouts that would allow future incorporation of a simple sand reclamation system. Include recommendations from equipment manufacturers and the Metalcasting Lab Technical Staff -Plans should include consideration of power/compressed air/maintenance requirements and added costs -Incorporate ergonomic and safety considerations, along with a smooth material flow of raw materials, molds (various sizes and shapes) and castings through the lab and disposal of waste sand -Provide cost estimates for all auxiliary equipment/storage/etc.

 
 

About

Our mission is to help bring the real-world into the classroom by providing engineering students with practical hands-on experience through industry-sponsored and client-based capstone design projects. Since its inception, the Learning Factory has completed more than 1,800 projects for more than 500 different sponsors, and nearly 9,000 engineering students at Penn State University Park participated in such a project.

The Learning Factory

The Pennsylvania State University

University Park, PA 16802